The roller is accessed from below. There are two plastic covers concealing the roller's swing-latch bearings. For a 500-sheet tray, proceed as follows (250-sheet is similar):
1) Tray Unit less tray upside down.
2) Front Sheet Metal Cross-Member
- Two M4x10mm bright washerhead threading screws.
3) Left Side Bearing Cover
- One claw at inboard rear corner.
4) Right Side Bearing Cover
- One claw at inboard centre.
5) Left Side Bearing
- Unlatch and remove it.
6) Right Side Bearing
- Unlatch and slide it rightward over the shaft.
Here's a view of the roller ready to be removed.
Don't forget to transfer the two slip rollers over to the new pickup roller.
# # #
# # #
No comments:
Post a Comment